SEA/00-11 |
---|
Design Status of the CLIC 3-TeV Beam Delivery System and Damping Rings |
R. Assmann, H. Burkhard, S. Fartoukh, J.B. Jeanneret, J.M. Jowett, F. Ruggiero, D. Schulte, A. Verdier, L. Vos, E. Wildner, F. Zimmermann, CERN; H. Owen, CLRC, O. Napoly |
Abtract: ======= We describe the present design status of the beam delivery and damping rings for CLIC at 3 TeV cm energy, and outline our future plans. The beam delivery system comprises collimation, final focus and post-IP exit line. Critical design aspects include halo collimation, machine protection, beam removal, and thermal stability analysis. In order to attain the design spot size at the collision point, the damping rings must provide beams of extremely small emittances. In this paper, we focus on collimation and spent beam. |